NSRP – DCSM 2019 PLC Replacement

Project Name:
Replace Quantum PLC with M580 for Substation SS1/2/8A/8B (Turnaround 4)
Project Duration:
Start date: 24th, Dec 2019
Finished date: 30th, Sep 2020
Project Scope:
Enersev was responsible for replacing the new PLC M580 and Fiber Optic Converter including:
- Site survey to provide a comprehensive technical solution
- Redesign system with new PLC M580 and new fiber optic converter
- Supply material at SS1, SS2, SS8A, SS8B substation
- Hardware installation, software configuration & upgrade, testing, troubleshooting, commissioning, and handover
- Support start up
Goals:
- To upgrade the old PLC by M580 at Substation SS1/SS2/SS8A/SS8B
- To keep system security, reliability, and performance, and risks under control
Results:
- Successfully replaced new PLC M580,
- System operate at good condition after upgrading