BSR – TA5 LV Switchgear Upgrade

Project Name:
Upgrading INSUM2 by UMC100.3 for ABB LV Switchgear (Turnaround 5)
Project Duration:
Start date: 30th, Jan 2023 Finished date: 30th, May 2024
Project Scope:
Enersev was responsible for upgrading INSUM2 by UMC100.3 for two LV Switchgear including:
- Site survey, design, detail engineering, risk mitigation plans, all the change-over design and OEM document supply,
- Supply Hardware
- Hardware installation, software configuration & upgrade, testing, troubleshooting, commissioning, and handover
- Support start up
- Training for operators and engineers
Goals:
- Conduct Site survey
- Detail design engineering
- Hardware procurement
- FAT at workshop
- SAT
- Commissioning
Results:
- Successfully upgrade the system
- During Plant starting up, all system was running smoothly and effectively