BSR – TA5 ICS System Upgrade

Project Name:

Upgrading service for ICS System in PP Plant-BSR (Turnaround 5)

Project Duration:

Start date: 23rd, June 2023
Finished date: 30th, May 2024

Project Scope:

Enersev was responsible for upgrading all the systems DCS/ESD/FGS with the latest proven and approved commercial of the Shelf (COTS) hardware and software including:

  • Site survey, design, detail engineering, risk mitigation plans, all the change-over design and OEM document supply,
  • Supply hardware and software
  • Hardware installation, software configuration & upgrade, testing, troubleshooting, commissioning, and handover
  • Support start up
  • Training for operators and engineers

Goals:

  • Existing hardware server/ workstation H90/92 replaced by new version of H90/H92
  • Convert Fox View/ FoxDraw to Control HMI
  • Migrate from FDSI Module to FDC280
  • Tristation 1131 software upgrade license to version 5.5
  • Existing hardware server/workstation H92 replaced by the new version of H92
  • Firmware upgrade for Communication and I/O module

Results:

  • Successfully replaced 04 Servers
  • Successfully replaced 07 Workstations
  • Migrate to FDC280 module
  • Successfully upgraded Tristation 1131 software to the new version for ESD/FGS System
  • Firmware upgrade successfully
  • During Plant starting up, all system was running smoothly and effectively